|
|
|
Commercial downtown building. Clip your lights before installing the clips on the kneewall.
|
|
|
|
Make sure the light is secure in the clip. This may mean repositioning it within the clip.
|
|
|
|
"Quaa-aa-aa-aaa-aaaack" goes the duct tape.
|
|
|
|
Temporarily secure the clips to the kneewall with high-quality duct tape. Do this before it gets cold or you'll have to warm the kneewall with a torch
|
|
|
|
Squirt a dot of all-weather caulk into the gap in the clip, thus securing it to the kneewall.
|
|
|
|
|
Repeat steps 1-5 150 times, or call a pro.
|
|
|
|
View of installed LED C7 lights atop a building in downtown Hebron, NE
|
|
|
|
View of installed LED C7 lights atop a building in downtown Hebron, NE. For perspective, note that the red lights are spaced 12" apart.
|
|
|